What was found
CRACK AT OTBD FRONT SPAR VERTICAL RIB STIFFENER IN NR 3 MAIN TANK AT WS 670. TEMP REPAIR, STOP DRILLED CRACK AND INSTALLED A REPAIR STRAP PER HAECO REPAIR SCHEME R-57-21-32967 AND BOEING FAX APPROVAL.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CRACK AT OTBD FRONT SPAR VERTICAL RIB STIFFENER IN NR 3 MAIN TANK AT WS 670. TEMP REPAIR, STOP DRILLED CRACK AND INSTALLED A REPAIR STRAP PER HAECO REPAIR SCHEME R-57-21-32967 AND BOEING FAX APPROVAL.