What was found
RESISTANCE CHECK REQUIRED BY AD 97-0317 FAILED ON NR 2 MAIN OUTBOARD FUEL JETTISON PUMP. REPLACED FUEL JETTISON PUMP PER BAC MM 28-31-01.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
RESISTANCE CHECK REQUIRED BY AD 97-0317 FAILED ON NR 2 MAIN OUTBOARD FUEL JETTISON PUMP. REPLACED FUEL JETTISON PUMP PER BAC MM 28-31-01.