What was found
LEVEL 2, STRINGER 44 HEAVILY CORRODED AT STA 1860, STA 1900 AND STA 1920. ALSO, CORROSION AREA HAD BEEN CRACKED THROUGH THE STRINGER. CORROSION REMOVED, 2 STRINGER SECTIONS ARE TO BE SPLICED IN AT BS 1850 AND BS 1910, USING HALF CHANNEL SPLICE AND STRAP AT EACH SPLICE LOCATION PER RS NR R-53-61-33414.