What was found
LEVEL 1 CORROSION, LWR FUSELAGE NR 1 HEAT EXCHANGER PANEL AROUND FASTENERS. REPAIRED AREA PER BOEING SRM 51-40-11 PRIMED AND PAINTED PER BOEING SRM 51-24-11.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
LEVEL 1 CORROSION, LWR FUSELAGE NR 1 HEAT EXCHANGER PANEL AROUND FASTENERS. REPAIRED AREA PER BOEING SRM 51-40-11 PRIMED AND PAINTED PER BOEING SRM 51-24-11.