Service difficulty report · Hinge Bracket · Cessna 207A

Difficulty date
May 18, 2015
Submitted
August 21, 2015
Operation
Air carrier
Aircraft
N93021
Make and model
Cessna 207A
Aircraft serial
20700766
Aircraft time
18,528 hours
System (JASC)
5751 · Ailerons
Part
Hinge Bracket
Part number
122005217
Condition
Cracked
Location
Lt Aileron
Part time
18,528 hours
Stage of operation
IN
How discovered
V
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

DURING A ROUTINE 100 HOUR INSPECTION, THE LT OTBD AILERON HINGE PN 1220052-17 WAS FOUND TO BE CRACKED IN THE VERTICAL WEB OF THE OTBD BRACKET THAT ATTACHES THE HINGE ASSEMBLY TO THE AFT WING SPAR. FURTHERMORE, UPON REMOVAL OF THE HINGE BRACKET ASSEMBLY THE AFT WING SPAR CHANNEL PN 1222106-13 WAS FOUND TO BE CRACKED ADJACENT TO ONE OF THE AILERON HINGE ASSEMBLY ATTACHING RIVETS. BOTH THE WING SPAR CHANNEL & THE AILERON HINGE BRACKET WERE REPLACED WITH NEW PARTS. THE ACFT HAS HIGH TOTAL TIME & THOUGH CYCLES ARE NOT TRACKED, THIS OPERATION HAS A HIGH NR OF CYCLES PER FLIGHT HOUR AS WELL AS FREQUENT TURBULENCE ENCOUNTERS. ALSO THE TWO RIVETS THAT ATTACH THE LOWER FLANGE OF THE AILERON HINGE BRACKET TO THE LOWER FLANGE OF THE SPAR CHANNEL HAD EVIDENTLY BEEN LOOSE FOR QUITE SOME TIME. I SUSPECT THAT THIS LOOSENESS CONTRIBUTED TO THE CRACKS IN THE BRACKET & THE SPAR CHANNEL. THIS IS ONE OF SEVERAL SIMILAR BRACKETS THAT HAVE BEEN FOUND CRACKED ON OUR FLEET, I RECOMMEND THAT OPERATORS OF HIGH TIME & HIGH FATIGUE ENVIRONMENT ACFT CONDUCT A VISUAL & TACTILE INSPECTION OF THE INTEGRITY OF THE AILERON HINGE BRACKETS ON THESE ACFT AT REGULAR INTERVALS.

More about the Cessna 207A