What was found
BS 312 FLOORBEAM HAS CORROSION FROM LBL 20 TO RBL 20 AT FASTENER HOLES. REPAIRED FLOORBEAM PER SRM 53-10-9.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
BS 312 FLOORBEAM HAS CORROSION FROM LBL 20 TO RBL 20 AT FASTENER HOLES. REPAIRED FLOORBEAM PER SRM 53-10-9.