What was found
ON JANUARY 22, 1995, PROPELLER ASSY WAS REMOVED FOR PROP DE-ICE FAILURE ON THE NR 1 BLADE. AFTER REMOVAL OF THE BAD DE-ICE BOOT, MOVEMENT WAS NOTED BETWEEN THE OUTER SLEEVE AND THE COMPOSITE MATERIAL. ALL BLADES WERE THEN INSPECTED AND 2 MORE BLADES WERE FOUND TO HAVE MOVEMENT. NO MOVEMENT IS ALLOWED IN THE AREA PER DOWTY CMM 61-10-36. THE PROPELLER WAS TAKEN OUT OF SERVICE AND SENT TO DOWTY AEROSPACE FOR INSPECTION. THE SUBSEQUENT DISASSEMBLY INSPECTION VERIFIED THE REMOVAL REASON.