Service difficulty report · Case · Urocop EC135P2

Difficulty date
July 22, 2008
Submitted
August 6, 2008
Operation
Air carrier
Aircraft
N137LN
Make and model
Urocop EC135P2
Aircraft serial
0339
Engine
Pwa PW206B
Part
Case
Condition
Cracked
Location
M/R Transmission
Part time
1,640 hours
Component
Transmission
Component part number
4649010008
Stage of operation
IN
How discovered
V
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

DURING A ROUTINE 800 HOUR INSPECTION, A CRACK WAS DISCOVERED IN THE WEBBING OF THE MAIN TRANSMISSION. THE CRACK IS IN THE MAIN CASE SUPPORT BUT THE IPC DOES NOT PROVIDE ANY TRANSMISSION SUBASSEMBLY PN. (K)