As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
DURING 18 MONTH INSP OF EMERGENCY FLOAT SYS, FOUND CABLE FOR ACTUATING DEPLOYMENT OF FLOATS CORRODED COMPLETELY THRU. CABLE FOR FLOAT SYS IS PART OF STC NR SR01855LA. SYS WAS INSTALLED ON ACFT 08 MAY 2008. MECHANICS INSTALLING REPLACEMENT CABLE WILL INSTALL WITH CPC AND DROPPING INSP TO 6 MONTHS FOR NOW.