What was found
DURING 500 HOUR INSPECTIONS FOUND FRAMES 5A & 7 CRACKED. DOUBLER WAS FABRICATED FROM .050 2024-O HEAT TREATED TO T3 & INSTALLED FOR FRAME 5A & DOUBLER MADE FROM 2024-T3 & INSTALLED ON FRAME 7 IAW REPAIR SHEET AHI2016-0040.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING 500 HOUR INSPECTIONS FOUND FRAMES 5A & 7 CRACKED. DOUBLER WAS FABRICATED FROM .050 2024-O HEAT TREATED TO T3 & INSTALLED FOR FRAME 5A & DOUBLER MADE FROM 2024-T3 & INSTALLED ON FRAME 7 IAW REPAIR SHEET AHI2016-0040.