What was found
DURING REPLACEMENT OF THE PAX OXYGEN CYLINDER N°2 REQUIRING ACCESS TO THE UNDERFLOOR AREA BELOW ACCESS PANELS 4C & 4D, THE FOLLOWING DEFECT WAS FOUND, OTBD RUDDER CONTROL CABLE FOUND OUT OF PULLEY AT STATION 277 & CHAFED AGAINST PULLEY’S SPACER, THE CABLE GUARD WAS INSTALLED. DAMAGE FOUND BEYOND LIMITS. NO WORKS WERE DONE BY MFG ON THE SUBJECT SYS & AREA DURING THE PREVIOUS PROJECT BN3AR002. DAMAGED CABLE TO BE REPLACED UNDER PROJ NR BN3AR002 ACT 4006 JC 0086 NOTIFY NR 10427444 REV NR 20006556.