What was found
CKB - RT FLAP IS CHAFED 1.8 INCHES FROM INBOARD EDGE AND 15.25 INCHES FROM TRAILING EDGE. REPAIRED IAW WVAC EO DH8S-57-0594.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CKB - RT FLAP IS CHAFED 1.8 INCHES FROM INBOARD EDGE AND 15.25 INCHES FROM TRAILING EDGE. REPAIRED IAW WVAC EO DH8S-57-0594.