Service difficulty report · Pressure Switch · Cndair CL6002C10

Difficulty date
July 30, 2002
Submitted
December 4, 2002
Operation
Air carrier
Aircraft
N603QX
Make and model
Cndair CL6002C10
Aircraft serial
10011
Aircraft time
1,604 hours, 1,306 cycles
Part
Pressure Switch
Part number
D98C09602
Part serial
364
Condition
Failed
Location
Fuel System
Part time
1,604 hours, 1,306 cycles
Stage of operation
TX
How discovered
O
Nature of condition
J
Precautionary procedure
O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

PDX - AFTER START AND AT IDLE, THE FUEL BOOST PUMPS CYCLED ON AND OFF. MAINTENANCE INSPECTED THE AIRCRAFT AND REPLACED THE LEFT AND RIGHT PRIMARY EJECTOR PRESSURE SENSORS. LEAK CHECK AND OPERATIONAL CHECKS WERE GOOD AND THE AIRCRAFT WAS RETURNED TO SERVICE.