As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
What was found
NR 1 ENGINE FAILED SCHEDULED BORESCOPE INSPECTION. FOUND TWO BLADES MISSING. REPLACED ENGINE. AIRCRAFT OPERATIONAL CHECK GOOD. AIRCRAFT RETURNED TO SERVICE. ENGINE UNDER INVESTIGATION AT GE. INVESTIGATION BY THE ENGINE MANUFACTURER (GE) HAS BEEN COMPLETED. IT HAS BEEN CONCLUDED THE MODIFICATION TO THE HPT1 DAMPNER (ALONG WITH RE-WORK OF THE ACCELERATOR) IS THE CORRECTIVE ACTION FOR THE REMOVED ENGINE. A PLAN HAS BEEN DEVISED TO INCORPORATE THIS MOD IN THE NEXT FEW QUARTERS.