Service difficulty report · Power Unit · Bombdr DHC8402

Difficulty date
April 9, 2005
Submitted
June 9, 2005
Operation
Air carrier
Aircraft
N403QX
Make and model
Bombdr DHC8402
Aircraft serial
4037
Aircraft time
9,627 hours, 10,470 cycles
Part
Power Unit
Part number
C1486561
Part serial
1016
Condition
Malfunctioned
Location
Te Flap Control
Part time
6,316 hours, 6,953 cycles
Stage of operation
TX
How discovered
O
Nature of condition
J
Precautionary procedure
O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

AFTER PUSHBACK FROM GATE AND SELECTED FLAPS -15 DEGREES, FLAP POWER CAUTION ILLUMINATED. PERFORMED ABNORMAL FLAP POWER CAUTION CHECK LIST. RESET FLAP CONTROL CIRCUIT BREAKER. SET FLAPS TO 15 DEGREES AND FLAP POWER CAUTION CAME ON AGAIN. MX REPLACED FLAP POWER UNIT IAW AMM TASK 27-52-01-000-801, ALL CHECKS GOOD. LEAK CHECK GOOD. NO FURTHER DEFECTS NOTED. AIRCRAFT RETURNED TO SERVICE.