Service difficulty report · Control Unit · Bombdr DHC8402

Difficulty date
June 12, 2007
Submitted
June 13, 2007
Operation
Air carrier
Aircraft
N419QX
Make and model
Bombdr DHC8402
Aircraft serial
4145
Aircraft time
1,089 hours, 1,004 cycles
Part
Control Unit
Condition
Malfunctioned
Location
De Ice System
Stage of operation
TX
How discovered
O
Nature of condition
J
Precautionary procedure
D

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

SEA FLIGHT NR 2257: AFTER PUSH BACK AND ENGINE START, DEICE CONT CIRCUIT BREAKER TRIPPED. AIRCRAFT RETURNED TO BLOCK. MAINTENANCE REMOVED AND REPLACED TMCU AND NR 2 HIGH PRESSURE SOV (P/N 820971-2). PERFORMED FUNCTIONAL CHECK OF THE AIRFRAME PNEUMATIC DEICING SYSTEM IAW Q400 AMM 30-11-00-720-801. FUNCTIONAL TEST GOOD. ALL OTHER INDICATIONS NORMAL. AIRCRAFT RETURNED TO SERVICE.