What was found
PDX -C4- CORROSION FOUND ON RT FLOORBEAM CASTELLATION AT STA 565. REMOVED FIVE RIVETS FROM CASTELLATION AND BLENDED OUT CORROSION REF CPCM CHAPTER 4. HFEC INSPECTED BLEND AREA FOR CRACKS IAW NDTM PART 6, 51-00-01, NO CRACKS NOTED. UT THICKNESS CHECK OF BLENDED AREA IAW NDTM PART 1, 51-00-04 HIGH .050 LOW .047. AREA OF BLEND WITHIN LIMITS PER SRM 51-20-11. APPLIED ALODINE AND PRIMER IAW SRM 51-20-16 AND 51-20-36. INSTALLED RIVETS IN CASTELLATION REF SRM 51-40-11.