Service difficulty report · Pump · Bombdr DHC8402

Difficulty date
March 26, 2008
Submitted
April 2, 2008
Operation
Air carrier
Aircraft
N427QX
Make and model
Bombdr DHC8402
Aircraft serial
4156
Aircraft time
2,493 hours, 2,467 cycles
Part
Pump
Part number
6617303
Part serial
K0422
Condition
Failed
Location
Hyd System
Part time
2,496 hours, 2,470 cycles
Stage of operation
CR
How discovered
O
Nature of condition
J
Precautionary procedure
O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

FLT 2459 - IN CRUISE THE NR 2 HYDRAULIC PUMP CAUTION ILLUMINATED FOLLOWED BY THE RUDDER CONTROL FOLLOWED BY THE NR 2 ISOLATION VALVE. NORMAL CHECKLIST DIRECTED PTU ON NR 1. HYDRAULIC FLUID HOT CAUTION LIGHT ON APPROACH. FLAPS SELECTED AND RECEIVED A FLAP POWER CAUTION LIGHT. LANDED WITH NO FLAPS, ALSO NO WHEEL BRAKES ON LANDING. STOPPED WITH THE EMERGENCY PARKING BRAKE. MAINTENANCE REPLACED THE ENGINE DRIVEN PUMP, THE PTU, PTU SELECTOR VALVE, HYDRAULIC RESERVOIR TEMP SWITCH. BLED THE NR 2 HYDRAULIC SYSTEM AND BLED NR 1 AND NR 2 HYDRAULIC SYSTEM, BLED BRAKES, AND TAXI CHECKED FOR NOSE WHEEL STEERING AND PARKING BRAKES. ALL CHECKS GOOD. AIRCRAFT RETURNED TO SERVICE.