What was found
PDX C4 CHECK FUSELAGE FRAME ANGLE HAS CORROSION AROUND 1 RIVET AT OTBD END LOCATED AT FS 98.000. REMOVED RIVETS AS NECESSARY AND BLENDED CORROSION IAW Q400 SRM 51-42-05, 51-21-00, AND RD8/4-53-2344 STEPS 1&2. HFEC INSP IAW D8-Q400 NDTM PART 6 51-00-01, NO CRACKS NOTED. THICKNESS CHECK IAW NDTM PART 1 51-00-01, FOUND TO BE OUT OF LIMITS. MAPPED FOR ENGINEERING. FOUND WITHIN LIMITS IAW RD8/4-53-2382. ALODINE PRIMED, INSTALLED RIVETS AND PAINTED IAW SRM 51-42-05.