Service difficulty report · Switch · Bombdr DHC8402

Difficulty date
December 11, 2008
Submitted
December 12, 2008
Operation
Air carrier
Aircraft
N410QX
Make and model
Bombdr DHC8402
Aircraft serial
4053
Aircraft time
18,167 hours, 18,373 cycles
Part
Switch
Part number
69494J905
Condition
Malfunctioned
Location
Bleed Overtemp
Stage of operation
DE
How discovered
O
Nature of condition
J
Precautionary procedure
O

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

SEA - NR 1 BLEED HOT CAUTION LIGHT ILLUMINATED AT APPROXIMATELY 13,000 FEET TURNED OFF BLEED NR 1 IAW CHECKLIST AND LIGHT EXTINGUISHED. RESET BLEED NR 1 IAW CHECKLIST, AND BLEED HOT CAUTION ILLUMINATED AGAIN. TURNED NR 1 BLEED OFF AGAIN AND NR 1 BLEED HOT CAUTION CAME ON AGAIN AND REMAINED ON FOR ALMOST 2 MINUTES BEFORE EXTINGUISHING, 3 MINUTES LATER, THE NR 1 BLEED HOT ILLUMINATED ON APPROACH FOR 40 SECONDS AND THEN EXTINGUISHED. FOUND "LT BLD ANA OT" FAULT MESSAGE IN CDS. REMOVED AND REPLACED NR 1 BLEED AIR OVERTEMP SWITCH IAW AMM TASK NR'S 36-11-16-000-801, AND 36-11-16-400-801. RAN ENGINES BLD HOT CAUTION DID NOT RE-OCCUR. NO FURTHER DEFECTS. RETURNED TO SERVICE.