What was found
MULTIPLE AREAS OF CORROSION ON FS 280.0 FLOORBEAM. REMOVED 280 BEAM LT IAW T/C SB670BA-53-026. RELOCATED AND DRILLED NEW 280 BEAM AND ANGLES IAW T/C SB670BA-53-26/B. INSTALLED LT SIDE 280 BEAM IAW SB670BA-53-026. REMOVED INTERCOSTALS ON RIGHT SIDE OF 280 BEAM. INSTALLED INBD AND OTBD INTERCOSTALS, LOCATED AND INSTALLED INTERCOSTAL BRACKET IAW T/C SB670BA-53-026/B. REMOVED RT 280 BEAM IAW SB670BA-53-026, LOCATED AND DRILLED NEW RT 280 BEAM IAW SB670BA-53-026. INSTALLED RT 280 BEAM IAW T/C SB670BA-53-26/C. LOCATED AND DRILLED UP 280 BEAM SPLICE PLATES IAW REO 670-53-11-047. LOCATED AND DRILLED UP SHIMS AND COUNTERSUNK HOLES FOR INSTALL OF DRIP TRAY IAW SB670BA-53-026/B AND REO 670-53-11-047. LOCATED AND DRILLED RT SIDE BRACKET BA670-30068-2. INSTALLED LT DRIP TRAY REF. T/C SB670BA-53-026/B INSTALLED INBD RT INTERCOSTAL REF T/C SB670BA-53-026/B. REMOVED LT AND RT NR 8 BRACKET, LT AND RT TEE BRACKET AND CAMLOCK CHANNEL, FABRICATED SHIM TO ADJUST FOR PRELOAD ON NR 8 RT BRACKET. INSTALLED LT AND RT TEE BRACKETS AND CAMLOCK CHANNEL REF T/C SB670BA-53-026/C COMPLETED INSTALL OF FWD 45 ANGLE BRACKETS TO 280 BEAM REF T/C R-53-496.