What was found
PDX - 8YR TASK - CORROSION ON FWD CENTER PORTION OF LAV SERVICE DOOR APERTURE. REMOVED CORROSION PER RD 8/4-53-347. REMOVED RIVETS TO FOM PER RD 8/4-53-347. HFEC INSP BLENDED AREA FOR CRACKS IAW Q400 NDTM PT 6, 51-00-01-250-801. NO CRACKS NOTED. UT THICKNESS CHECK IAW Q400 NDTM PT 1, 51-00-04. HIGH .075 LOW .044. BLENDED AREA IS .046 REMAINING THICKNESS AND OUT OF LIMITS PER RD 8/4-53-347. CUT OUT DAMAGED AREA PER RD 8/4-53-347. HFEC IAW -8 400 NDTM PT 6, 51-00-01. NO CRACKS NOTED. FABRICATED PACKERS AND BACKING PLATE, ALODINED AND PRIMED PER RD 8/4-53-347. INSTALLED TWO REPAIR PACKER AND BACKING PLATE AND COMPLIED WITH STEPS 4-11 OF RD 8/4-53-347 SHEET 9.