What was found
RT L/E CHAFING BETWEEN 684FT AND 684GT PANELS ON INBD FLAP VANE. BLENDED CHAFED AREA. REMOVED MATERIAL IS .006" AND WITHIN LIMITS. TREATED PRIMED AND PAINTED AREA.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
RT L/E CHAFING BETWEEN 684FT AND 684GT PANELS ON INBD FLAP VANE. BLENDED CHAFED AREA. REMOVED MATERIAL IS .006" AND WITHIN LIMITS. TREATED PRIMED AND PAINTED AREA.