Service difficulty report · Relay · Bombdr DHC8402

Difficulty date
January 16, 2010
Submitted
January 21, 2010
Operation
Air carrier
Aircraft
N429QX
Make and model
Bombdr DHC8402
Aircraft serial
4161
Aircraft time
6,720 hours, 7,267 cycles
Part
Relay
Condition
Failed
Location
Fuel System
Stage of operation
CL
How discovered
O
Nature of condition
J
Precautionary procedure
A

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

NR1 AUX PUMP WOULD NOT TURN OFF AFTER T/O. RETURNED TO FIELD, LANDING UNEVENTFUL. PERFORMED OPS CHECK OF AUXILIARY PUMPS IAW AMM TASK 28-21-31-710-801,OPS CHECK GOOD. IAW MX CONTROL REQUEST REPLACED 2800-K1 RELAY LOCATED IN FUEL TRANSFER RELAY RACK PANEL IAW AMM TASK 20-30-16-960-801, ALSO REPLACED NR 1 AUX PUSH BUTTON SWITCH IAW AMM TASK 31-10-01-000/400-802. PERFORMED OPS TEST OF THE AUXILIARY PUMPS IAW TASK 28-21-31-710-801, OPS CHECKS GOOD, NO DEFECTS NOTED. REMOVED FUEL TRANSFER RELAY PANEL IAW AMM TASK 28-23-21-000-801, RE-SOLDERED WIRE TO DIODE 2800-CR2, RE-INSTALLED FUEL TRANSFER RELAY PANEL IAW AMM TASK 28-23-21-400-801, PERFORMED OPS CHECK OF THE FUEL TRANSFER SYS IAW AMM 28-23-00-710-801, OPS CHECK GOOD, NO FURTHER DEFECTS NOTED. RETURNED TO SERVICE.