What was found
C CHECK - BOTH RT AND LT 280 BEAMS CRACKED AND CORRODED. REMOVED LT AND RT 280 BEAM IAW SRM 51-42-13-001-001-A01 AND 51-42-06-001-001-A01. PREPARED NEW 280 BEAM IAW SRM 51-40-11-001-001-A01 AND REO 670-53-11-047. PERFORMED CUTLINE ON BEAM IAW REO 670-53-11-047. BLENDED LT AND RT FLOORBEAM TO PROVIDE CLEARANCE TO FACILITATE FS 280 BEAM INSTALLATION IAW REO 670-53-11-045. PERFORMED LPI ON BEAM CUTLINE, NO CRACKS NOTED AT THIS TIME. INSTALLED LT AND RT 280 BEAM IAW REO 670-53-11-047. TOP COATED ALL FASTENERS AS REQUIRED IAW SRM 51-25-16-001-001-A01. APPLIED CORROSION INHIBITING COMPOUND TO AFFECTED AREAS IAW SRM 51-21-11-001-001-A01.