What was found
C-CHECK - LT SIDE FS 280 BEAM CRACKED. REMOVED DRIP PANS AND INTERCOSTALS FOR AS REQUIRED IAW SRM 51-42-13-001-001-A01 AND 51-42-21-001-001-A01. DRILLED OFF CRACKED 280 BEAM IAW SRM 51-42-06-001-001-A01. ALL WORK IAW REO 670-53-11-047. PERFORMED CUT LINE ON NEW 280 BEAM IAW REO 670-53-11-052. PERFORMED LPI ON 280 BEAM CUTLINE, NO CRACKS FOUND AT THIS TIME IAW NDTM LPI 51-20-008-230-A01, REO 670-53-11-047. LOCATED FASTENER HOLES IAW REO670-53-11-047. INSTALLED NEW BEAM IAW REO 670-53-11-047. REINSTALLED INTERCOATALS AND DRIP PAN IAW SRM 51-42-21-001-001-A01 AND 51-42-13-001-001-A01. TOPCOATED AND APPLIED CORROSION INHIBITING COMPOUND IAW SRM 51-25-16-001-001-A01 AND 51-21-11-001-001-A01.