Service difficulty report · Skin · Bombdr DHC8402

Difficulty date
September 17, 2012
Submitted
September 19, 2012
Operation
Air carrier
Aircraft
N409QX
Make and model
Bombdr DHC8402
Aircraft serial
4051
Aircraft time
26,610 hours, 27,573 cycles
Engine
Pwc PW150A
Part
Skin
Condition
Damaged
Location
Fuselage
Stage of operation
IN
How discovered
V
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

FUSELAGE SKIN HAS FRETTING DAMAGE AROUND PERIMETER OF RT ICE SHIELD. REMOVED 7 RIVETS FROM AFT PERIMETER OF RT ICE SHIELD IAW SRM 51-42-05-02-01. REMOVED FRETTING DAMAGE ON SKIN IAW SRM 51-14-00-02-03. MIN REMAINING THICKNESS .035" REF NDTM 51-00-02-250-801 PT 4, CONFIRMED PERIMETER OF ICESHIELD CRACK FREE REF NDTM 51-00-01-250-801 PT 6. MATERIAL LOSS FOUND TO BE WITHIN LIMITS IAW RD 8/4-53-4796. APPLIED ALODINE PRIMER AND PAINT IAW RD 8/4-53-4796. INSTALLED NEW RIVETS AS REQUIRED IAW SRM 51-42-05-02-01 AND 51-23-00-00-01. COMPLIED WITH TASK CARD RD 8/4-53-4796.