Service difficulty report · Frame · Bombdr DHC8402

Difficulty date
March 14, 2013
Submitted
March 25, 2013
Operation
Air carrier
Aircraft
N410QX
Make and model
Bombdr DHC8402
Aircraft serial
4053
Aircraft time
27,772 hours, 28,835 cycles
Part
Frame
Condition
Corroded
Location
Fuselage
Stage of operation
IN
How discovered
V
Nature of condition
O
Precautionary procedure
K

As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.

What was found

FRAME 49.5 FLANGES ARE CORRODED STR 28P-31P. REMOVED (2) RIVETS BETWEEN STR 29P TO 30P AND (4) RIVETS BETWEEN STR 30P AND 31P FOR ACCESS IAW SRM 51-42-05-02-01, REV 12. REMOVED CORROSION IAW SRM 51-21-00-00-02, REV 12. VERIFIED MINIMUM REMAINING THICKNESS BETWEEN 29P-30P AS 0.048" AND 30P-31P AS 0.043" IAW NTM 51-00-04-910-801, REV 8, PART 1 ALSO VERIFIED CRACK FREE IAW NTM 51-00-06-910-801, PART 1, REV . NO CORROSION NOTED BETWEEN STR 28P AND 29P. ORIGINAL THICKNESS OF FRAME IS .050", FLANGE BETWEEN 29P-30P IS WITHIN LIMITS IAW SRM 53-00-00-02-09, REV 12. FLANGE BETWEEN STR 30P TO 31P IS OUT OF LIMITS IAW SRM 53-00-00-02-09, REV 12. TRIMMED OFF DAMAGED FLANGE IAW SRM 53-00-00-02-18, STEP 7B(1-4) REV 12. CONFIRMED AREA CRACK FREE IAW SRM 53-00-00-02-18, REV 12 IAW NDTM 8.2 REV 14. 2 RIVETS MORE REMOVED WHEN FLANGE TRIMMED OFF IAW SRM 51-42-05-02-01, REV 12. FABRICATED REPAIR FLANGE OUT OF 2024-T3 0.063" PO52912H IAW SRM 53-00-00-02-18, REV 12. MATCH DRILLED, REPAIR FLANGE TO SKIN AND FRAME IAW SRM 51-40-07-02-01 REV 12. OK TO INSTALL REPAIR FLANGE. INSTALLED REPAIR FLANGE IAW SRM 53-00-00-02-18 REV 12. APPLIED PRIMER AND ALUMINIZED PAINT IAW SRM 53-00-00-02-18, REV 12. APPLIED CPC IAW SRM 53-00-00-02-18, REV 12. PRIOR TO APPLICATION OF TOP COAT, REINSTALLED 2 ADDITIONAL RIVETS WHICH WERE REMOVED FOR FOM IAW SRM 51-42-05-02-01, REV 12.