What was found
AFTER LEVELING AT CRUISE ALTITUDE, FL220 NR1 AND NR2 DC GENERATOR CAUTION LIGHTS ILLUMINATED. COMPLIED WITH EMER/ABNORMAL CHECKLIST. NR 2 DC GENERATOR RESET. NR 1 DC GENERATOR FAILED TO RESET. COMPLIED WITH NR 1 DC GENERATOR CHECKLIST. NO ABNORMAL INDICATIONS FROM REMAINING ELECTRICAL SOURCES. PERFORMED OPS TEST OF THE MAIN 28VDC GENERATOR SYS REF AMM 24-31-00-710-802. VERIFIED NORMAL OPERATION OF NR 1 AND NR 2 DC GENERATOR SYSTEM. RETURNED TO SERVICE.