What was found
THREE RIVETS CORRODED ON THE RT INBD FLAP UPPER L/E. REMOVED CORRDED RIVETS ON RT FLAP IAW SRM 51-42-15, PROCEDURE 5, TIEM G, STEP 1. INSTALLED NEW RIVETS IAW SRM 51-42-15 PROCEDURE 5, ITEM E, STEPS 1-3.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
THREE RIVETS CORRODED ON THE RT INBD FLAP UPPER L/E. REMOVED CORRDED RIVETS ON RT FLAP IAW SRM 51-42-15, PROCEDURE 5, TIEM G, STEP 1. INSTALLED NEW RIVETS IAW SRM 51-42-15 PROCEDURE 5, ITEM E, STEPS 1-3.