What was found
NR 2 ENGINE TAKES LONGER THAN NORMAL TIME TO COME OUT OF FEATHER WITH POWER LEVERS AT FLIGHT IDLE. IAW MAINTENANCE REQUEST, R & R NR 2 OSG AS PRECAUTIONARY MEASURE WITH NEW FROM STOCK IAW AMM 61-20-26-400-801 AND 61-20-26-000-801. OPS CHECK GOOD. DURING INSTALLATION, REF HS 61-0038 FOR HEAT SHRINK. PERFOMRED FUNCTIONAL TEST OF PROP TIME TO UNFEATHER IAW AMM 61-20-00-720-801. UNFEATHER TIME WITHIN LIMITS. PERFORMED ENGINE LEAK CHECK IAW AMM 71-00-00-790-801, LEAK CHECK GOOD. RETURNED TO SERVICE.