What was found
NR 2 PROP WOULD NOT UNFEATHER VIA UNFEATHER SWITCH ON MTX PANEL. FOUND RING TERMINAL BROKEN OFF PROP 2 AUX PUMP CB (S4) REPLACED RING TERMINAL PER WM 20-12-15-1, OP TEST OF FEATHER PUMP GOOD IAW 61-20-00-710-802.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
NR 2 PROP WOULD NOT UNFEATHER VIA UNFEATHER SWITCH ON MTX PANEL. FOUND RING TERMINAL BROKEN OFF PROP 2 AUX PUMP CB (S4) REPLACED RING TERMINAL PER WM 20-12-15-1, OP TEST OF FEATHER PUMP GOOD IAW 61-20-00-710-802.