What was found
NACELLE HIGH RATE FIRE BOTTLE AFT DISCHARGE TUBE CRACKED. REMOVED AND INSTALLED SERVICEABLE TUBE PN 82620125-001, IAW Q400 AMM TASK 26-21-01-400-801 PARA 4B STEPS 5 THRU 10.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
NACELLE HIGH RATE FIRE BOTTLE AFT DISCHARGE TUBE CRACKED. REMOVED AND INSTALLED SERVICEABLE TUBE PN 82620125-001, IAW Q400 AMM TASK 26-21-01-400-801 PARA 4B STEPS 5 THRU 10.