What was found
DURING HEAVY CHECK MAINTENANCE FOUND CENTER FUSELAGE III, FLOOR DOUBLER CORRODED AT FR 84, BL 12. CENTER FUSELAGE III, CORRODED FLOOR DOUBLER AT FR 84, RLB12, REMOVED AND REPLACED IAW EMBRAER 170/175 SRM 51-43-02.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING HEAVY CHECK MAINTENANCE FOUND CENTER FUSELAGE III, FLOOR DOUBLER CORRODED AT FR 84, BL 12. CENTER FUSELAGE III, CORRODED FLOOR DOUBLER AT FR 84, RLB12, REMOVED AND REPLACED IAW EMBRAER 170/175 SRM 51-43-02.