What was found
WHILE A/C WAS IN FOR HEAVY CHECK FOUND GOUGE AT THE BASE OF THE VERTICAL STAB FR 92-93 STR 3-4 LT. MX FABRICATED DOUBLER AND FILLER, ALODINE, PRIME AND TOP COAT IAW 51-40-02, 51-41-02, 51-23-04, 51-23-05, 51-23-06, 53-30-01. FCS IS AFFECTED FCBS 53-30-00-002 REQUIRED RE-INSPECTION OF EXTERNAL DETAIL AT 20000 FC AFTER REPAIR ACOMPLIMENT WITH 10000 FC INTERVALS THERE AFTER. A/C REMAINS IN CMH FOR HEAVY CHECK COMPLETION. ..MAJOR..