What was found
MAINTENANCE REPORTED NR 1 EMERGENCY LIGHT POWER UNIT FAILED TEST. MAINTENANCE REMOVED AND REPLACED NR 1 ELPU PER EMB AMM, OPS CHECK GOOD.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
MAINTENANCE REPORTED NR 1 EMERGENCY LIGHT POWER UNIT FAILED TEST. MAINTENANCE REMOVED AND REPLACED NR 1 ELPU PER EMB AMM, OPS CHECK GOOD.