What was found
DURING HEAVY CHECK, LT FLOORBEAM AT FRAME 18 INTERCECTION IS CORRODED.CUT OUT DAMAGE FABRICATED DOUBLER FROM PO 006699-2014, 20124-T3.080 FABRICATED FILLER FROM PO 023645-2011, 7475-T761.071, INSTALLED DOUBLER AND FILLER ALODINE PRIMED APPLIED TOP COAT IAW SRM 53-10-10,51-40-02, 51-23-04, 51-23-05, 51-23-06, 51-43-04 & ETD 2014-170-091945.