What was found
DURING HEAVY CHECK, DAMAGE TO CFLLL LT LOWER SKIN REQUIRES COLD WORKING AND BLENDING. MAINTENANCE HAS PERFORMED THE COLD FORMING OF DAMAGED AREAS PERFORMED HFEC TO ENSURE THERE ARE NO CRACKS, BLENDED OUT GOUGE AND DAMAGE AND THICKNESS REDUCTION HAS BEEN RECORDED. THIS REPAIR IS CONSIDERED TEMPORARY AS IT WILL REQUIRE DETAILED STRUCTURE ANALYSIS, THIS REPAIR VALIDITY OF THIS REPAIR IN 12 MONTHS. THIS REPAIR WAS PERFROMED IAW ETD 2015-170-002528-A. THIS IS MAJOR REPAIR. PN 170-91882-001, SKIN LOWER.