What was found
DURING HEAVY CHECK, THE INTERCOSTAL BRACKET FWD OF THE AFT FUSELAGE HOT WATER DRAIN UNDER RT SIDE OF POTABLE WATER TANK IS CORRODED. MAINTENANCE R & R THE BRACKET IAW SRM 51-41-01, 51-42-02.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING HEAVY CHECK, THE INTERCOSTAL BRACKET FWD OF THE AFT FUSELAGE HOT WATER DRAIN UNDER RT SIDE OF POTABLE WATER TANK IS CORRODED. MAINTENANCE R & R THE BRACKET IAW SRM 51-41-01, 51-42-02.