What was found
WHILE IN HEAVY CHECK, CORROSION CENTER FUSELAGE III WET AREA 53-23 RT BEAM Y=+10-748. REMOVED AND REPLACED BEAM PN: 170-65669-004.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
WHILE IN HEAVY CHECK, CORROSION CENTER FUSELAGE III WET AREA 53-23 RT BEAM Y=+10-748. REMOVED AND REPLACED BEAM PN: 170-65669-004.