What was found
WHILE IN HEAVY CHECK - CORROSION STRUCTURAL CENTER FUSELAGE III WET AREA 53-23 RH BEAM Y=+10.748" FR 86-89. REPLACED BEAM.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
WHILE IN HEAVY CHECK - CORROSION STRUCTURAL CENTER FUSELAGE III WET AREA 53-23 RH BEAM Y=+10.748" FR 86-89. REPLACED BEAM.