What was found
WHILE AIRCRAFT WAS OUT OF SERVICE FOR HEAVY CHECK *** LH STAB L/E 2ND RIB FROM I/B WAS FOUND CRACKED. RIB WAS REPLACED IAW SRM 51-41-02. AIRCRAFT REMAINS OUT OF SERVICE FOR HEAVY CHECK COMPLETION.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
WHILE AIRCRAFT WAS OUT OF SERVICE FOR HEAVY CHECK *** LH STAB L/E 2ND RIB FROM I/B WAS FOUND CRACKED. RIB WAS REPLACED IAW SRM 51-41-02. AIRCRAFT REMAINS OUT OF SERVICE FOR HEAVY CHECK COMPLETION.