What was found
L1 DOOR SLIDE STARTED TO DEPLOY. SLIDE IS ENGAGED IN GIRT BAR. FERRIED TO IND. R&R L1 DOOR SLIDE, OPS CHECK GOOD REF AMM 25-65-01.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
L1 DOOR SLIDE STARTED TO DEPLOY. SLIDE IS ENGAGED IN GIRT BAR. FERRIED TO IND. R&R L1 DOOR SLIDE, OPS CHECK GOOD REF AMM 25-65-01.