What was found
DURING HEAVY CHECK. FLOOR SUPPORT STRUCTURE CENTER SHEAR PANEL BETWEEN FR87 AND FR88 HAS CORROSION. SHEAR PANEL WAS REPLACED IAW SRM 51-42-02. AIRCRAFT REMAINS OUT OF SERVICE FOR HEAVY CHECK COMPLETION.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING HEAVY CHECK. FLOOR SUPPORT STRUCTURE CENTER SHEAR PANEL BETWEEN FR87 AND FR88 HAS CORROSION. SHEAR PANEL WAS REPLACED IAW SRM 51-42-02. AIRCRAFT REMAINS OUT OF SERVICE FOR HEAVY CHECK COMPLETION.