What was found
WHILE IN HEAVY CHECK - CORROSION ON DOUBLER AT FRAME 90 Y+10.748. REMOVED AND REPLACED DOUBLER AT FRAME 90 Y+10.748. REF EMB SRM 51-40-08.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
WHILE IN HEAVY CHECK - CORROSION ON DOUBLER AT FRAME 90 Y+10.748. REMOVED AND REPLACED DOUBLER AT FRAME 90 Y+10.748. REF EMB SRM 51-40-08.