What was found
CORROSION FOUND ON CENTER FUSELAGE III FLOOR STRUCTURE L/H UPPER DOUBLER AT FR 85. CENTER FUSELAGE III FLOOR STRUCTURE L/H UPPER DOUBLER AT FR 85 HAS BEEN REPLACED WITH NEW AND INSTALLED IAW EMB 170-175 SRM 51-41-01 AND 51-43-03.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
CORROSION FOUND ON CENTER FUSELAGE III FLOOR STRUCTURE L/H UPPER DOUBLER AT FR 85. CENTER FUSELAGE III FLOOR STRUCTURE L/H UPPER DOUBLER AT FR 85 HAS BEEN REPLACED WITH NEW AND INSTALLED IAW EMB 170-175 SRM 51-41-01 AND 51-43-03.