What was found
DURING HEAVY CHECK MAINTENANCE FOUND CENTER FUSELAGE III, FLOOR STRUCTURE, RH SHEAR PANEL CORRODED AT FR87R TO FR88R, RBL 24. REPLACED CFII FLOOR STRUCTURE RH SHEAR PANEL AT FR87 TO FR88, RBL24, WITH NEW IAW SRM 51-42-01.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING HEAVY CHECK MAINTENANCE FOUND CENTER FUSELAGE III, FLOOR STRUCTURE, RH SHEAR PANEL CORRODED AT FR87R TO FR88R, RBL 24. REPLACED CFII FLOOR STRUCTURE RH SHEAR PANEL AT FR87 TO FR88, RBL24, WITH NEW IAW SRM 51-42-01.