What was found
DURING HEAVY CHECK FWD FUSELAGE FLOOR DOUBLER/SILL BETWEEN FR12 -FR14 AND BETWEEN RBL36-RBL48 FOUND CORRODED. REMOVED AND REPLACED FLOOR DOUBLER/SILL IAW EMB 170/175 SRM 51-43-04 AND 51-41-02
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING HEAVY CHECK FWD FUSELAGE FLOOR DOUBLER/SILL BETWEEN FR12 -FR14 AND BETWEEN RBL36-RBL48 FOUND CORRODED. REMOVED AND REPLACED FLOOR DOUBLER/SILL IAW EMB 170/175 SRM 51-43-04 AND 51-41-02