What was found
DURING HEAVY CHECK MAINTENANCE FOUND FLOOR DOUBLER HAS LEVEL 2 CORROSION. REPLACED DOUBLER IAW SRM 51-40-08
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING HEAVY CHECK MAINTENANCE FOUND FLOOR DOUBLER HAS LEVEL 2 CORROSION. REPLACED DOUBLER IAW SRM 51-40-08