What was found
DURING SCHEDULED C2 CHECK, FOUND CORROSION ON FUSELAGE SKIN, CORROSION BEYOND LIMIT. REMOVED DAMAGED AREA, FABRICATED DOUBLER PER SRM 53-30-3 FIG 1 STEPS 1-10. INSTALLED DOUBLER PER 727 SRM 53-30-3 STEPS 11-15.
As reported to the FAA. Reports are unverified, and codes are left as the FAA publishes them.
DURING SCHEDULED C2 CHECK, FOUND CORROSION ON FUSELAGE SKIN, CORROSION BEYOND LIMIT. REMOVED DAMAGED AREA, FABRICATED DOUBLER PER SRM 53-30-3 FIG 1 STEPS 1-10. INSTALLED DOUBLER PER 727 SRM 53-30-3 STEPS 11-15.